Home > Projets > Aquasud Complex

Differdange

First municipal public-private partnership initiated in Luxembourg
With a covered surface area of approximately 10,000 m², the Aquasud complex comprises six pools in addition to the renovated existing open-air pool. It also includes a fitness and wellness complex (spa), one 60 m and one 70 m slide, along with numerous outdoor sports facilities.
The pools are in stainless steel.

Project owner: TRALUX CONSTRUCTION
Operator: Vert Marine
Architect: M3 Architectes
Static structure design office: Schroeder & Associés
Prizes and awards: PPP-Innovationspreis 2014 awarded in Berlin for the innovation and mutual benefits of a new public-private partnership project

CONSTRUCTION METHOD

The roof frame is made entirely in wood and consists of 13 glulam beams, each weighing 9 metric tons, with a span of 37 ml. The roofing is made with hollow-core slabs in wood, along with a Lignatur system that integrates acoustic elements to reduce the reverberation of ambient noise.
The roof is entirely covered in vegetation to reduce heat loss and meet sustainable development standards.

TECHNICAL CHARACTERISTICS

• PPP: Public-Private Partnership
• General contracting
• Design, build, operation over 25 years

KEY WORKSITE FIGURES

• Land area: 10,200 m²
• Useful built area: 9,550 m²
• Built volume: 51,250 m³
• Reinforcements: 600 T
• Green spaces: 5,000 m²