Home > Projets > Froëlicher College

Sissonne (02)

General contracting project to build a 500-student middle school with a kitchen and cafeteria

Project owner: Aisne department General Council
Assistant project owner: SEDA (Société d’Equipement du Département de l’Aisne)
Project manager: DAUDRE-VIGNIER Architecte
Structural design office: BEG THUROTTE
Duration of work: 16 months
Energy performance: RT 2005 French environmental regulation standards

CONSTRUCTION METHOD

Shallow foundations, cast-in-place walls, pre-slab and hollow-core slab floors, precast beams cardboard column formwork, glued laminated timber frame and timber truss, mixed wood and aluminum joinery.

TECHNICAL CHARACTERISTICS

  • • Building envelope in timber-frame walls and three-slope green roof in corrugated sheeting, KNX building control system (climate control, lighting and blinds).
  • • Acoustic ceiling in BASWA phon.

KEY WORKSITE FIGURES

Earthworks: 10,061 m3
Formwork: 8,186 m²
Concrete: 2,261 m3
Steel: 62 metric tons
Sealing: 4,800 m²
Average number of staff: 20 people