Sissonne (02)
General contracting project to build a 500-student middle school with a kitchen and cafeteria
• Project owner: Aisne department General Council
• Assistant project owner: SEDA (Société d’Equipement du Département de l’Aisne)
• Project manager: DAUDRE-VIGNIER Architecte
• Structural design office: BEG THUROTTE
• Duration of work: 16 months
• Energy performance: RT 2005 French environmental regulation standards
Shallow foundations, cast-in-place walls, pre-slab and hollow-core slab floors, precast beams cardboard column formwork, glued laminated timber frame and timber truss, mixed wood and aluminum joinery.
• Earthworks: 10,061 m3
• Formwork: 8,186 m²
• Concrete: 2,261 m3
• Steel: 62 metric tons
• Sealing: 4,800 m²
• Average number of staff: 20 people