Home > Projets > Loup-Pendu Aquatic Center

Rillieux-la-Pape (69)

ALL-TRADES DESIGN-BUILD OF THE NEW AQUATIC CENTER FOR THE CITY OF RILLIEUX-LA-PAPE

Main building with 2,900 m² of usable floor area / 4,100 m² total floor area: 1 25-meter sports pool, 8 lanes with bleachers, 1 190-m² leisure pool, 1 225-m² pool for swimming lessons and aquatic activities, 1 75-m² paddling pool, 1 wellness area with sauna, steam room and spa.
7,000-m² outdoor park with coping , play area and water slide.

Project owner: DEMATHIEU BARD IMMOBILIER – SEMOP du Loup Pendu
Architect: CHABANNE + PARTENAIRES
Structural design office: CERBETON
Fluid dynamics/roads and utility works/environmental quality design office: KEO INGENIERIE
Acoustics design office: GENIE ACOUSTIQUE
Duration of work : 19 months
Consumption targets: 3,100 kWhPE/m2 of pool surface/year and 99 L/bather

CONSTRUCTION METHOD

• Shallow footing foundations
• Reinforced concrete infrastructure
• Metal building frame

SPECIFIC TECHNICAL FEATURES

• Self-protected waterproofing on pool shell, single- and double-skin metal cladding, concrete coating, aluminum exterior joinery and curtain walls.
• Heating system connected to the heating network, supplementary heating via gas boiler, hot water heating via heating system, underfloor heating for coping, radiators for technical facilities, thermodynamic air treatment in indoor pool areas.

KEY WORKSITE FIGURES

Usable floor area: 2,900 m²
Floor space: 4,100 m²
Outdoor park: 7,000 m²
Total number of integration hours: 2,700 hours
Average workforce on site: 30 people