Chateaurenard (13)
Construction of a general education high school for 900 students, with 6,036 m² of usable floor area, including a cafeteria, six staff housing units, and a multi-sport gymnasium with 1,534 m² of usable floor area located outside the high school complex in the Châteaurenard sports field.
• Project owner : AREA PACA
• Project manager : MARCIANO ARCHITECTURE and José MORALES
• Methods design office : LOGIK
• Structural design office : INGENIERIE 84
• Duration of work : 15 months
• Energy performance : RT 2012 (French thermal regulation standards)
• Labels and certifications : Low Nuisance Worksite / Mediterranean Sustainable Building (BDM Bronze certification)
• Prizes and awards : Winning project in the 2020-2021 Technal Aluminium Architecture Awards
• Earthworks : 8,000 m3
• Usable floor area : 6,036 m² + 6 staff housing units + a 1,534 m² gym
• Formwork : 65,000 m²
• Concrete : 10,500 m3
• Steel : 600 metric tons
• Integration hours : 10,100
• Average workforce on site : 50 workers, 3 site managers
Revivez les temps forts et suivez l’évolution du chantier en images
Les collaborateurs qui ont participé et mené à bien cette mission
17, rue Venizelos
57950 Montigny-les-Metz
(+33) 03 87 66 73 11