Home > Projets > Media village

Dugny (93)

CONSTRUCTION OF 103 APARTMENTS AND A CAR PARK

Construction of 103 apartments and a 63-place car park to meet demand for journalist accommodation during the Olympic Games in Paris in 2024.
The project comprises two (4-floor and 7-floor) buildings, each with two stairwells, plus an underground level.
The facades will be in maxibrick. The facades will be in maxibrick, with pink-glazed concrete on the walls of the corner apartment loggias. The four roof terraces will be planted.
The facades will be in maxibrick, with pink-glazed concrete on the walls of the corner apartment loggias. Future residents will benefit from large glazed surfaces.
A shared terrace.

Project owner: DEMATHIEU BARD IMMOBILIER
Architect: CLE Millet
Project manager: MOX
Design office - structure: SL Structures
Duration of work: 27 months

CONSTRUCTION SCOPE

  • • Concrete floors
  • • Facades in maxibrick and concrete posts
  • • Concrete interior walls
  • • Concrete interior loggia walls
  • • Works executed in CEM III low-carbon concrete incorporating blastfurnace slag and clinker

SPECIFIC TECHNICAL FEATURES

  • • Fire safety
  • • Piles
  • • Precast concrete elements
  • • Maxibrick facades

KEY WORKSITE FIGURES

Concrete: 4 548 m3
Steel: 353 metric tons
Sealing: 2 303 m²
Area: 12 966 m²
Work-integration hours: 15 970

ENERGY PERFORMANCE

• E3 C1
• Bbio < Bbio max -40%
• DHW consumption< 30kWh.FE/m². SDP.year SDP.an
• Heating consumption < 25kWh.FE/m². SDP.year SDP.an
• Renewable energy rate 70%
• Low-carbon concrete: max carbon weight (concrete + steel) lower than 180 kg CO2/m3

LABELS AND CERTIFICATIONS

• Prestaterre label certification BEE new housing standard 4-star level without option
• BiodiverCity label

© CLA Millet

Les étapes de ce projet

Revivez les temps forts et suivez l’évolution du chantier en images

L’équipe du projet

Les collaborateurs qui ont participé et mené à bien cette mission