Mérignac (33)
Design-build of a new five-story building.
The site will house a police station, a training center for the municipal police force, an area for national and municipal police forces, meeting rooms for Mérignac city hall, and a parking lot.
• Project owner : SGAMI and Municipality of Mérignac (joint owners)
• Project manager : Lacrouts Massicault / CETAB / IDB Acoustique
• Methods design office : DEMATHIEU BARD Technical Department
• Structural design office : INGEBA
• Contracting consortium : DEMATHIEU BARD CONSTRUCTION (lead) / DEMATHIEU BARD IMMOBILIER / Lacrouts Massicault / CETAB / IDB Acoustique
• Duration of work : 19 months
• Type of contract : design-build/general contracting
• BIM : Level 2
• White polished concrete walls on the ground floor
• Precast slab floor
• Painted concrete walls for the superstructure
• Metal slats on facade running vertically along the entire building
• Inclusion of Security work package
• BR4-BR6 joinery on ground floor (assault rifle bullet resistance)
• Architectural and technical design of security buildings (roads, structure, heating, ventilation)
• Future spatial and functional integration with a real estate complex and two private housing units
• Total floor area : 4,897 m²
• Floor space : 4,500 m²
• Reinforced concrete : 2,000 m3
• Steel: 70 metric tons
• Professional integration : 4,750 hours