Strasbourg (67)
Construction of an eight-story office building covering 15,000 m² for European institutions in the Wacken international business district in Strasbourg.
All-trades contract.
• Project owner: ICADE
• Project manager: Consortium with OSLO ARCHITECTES (lead) / ARTBUILD ARCHITECTS / OTE / EGIS / CTE / LINDER PAYSAGE
• Methods design office: DEMATHIEU BARD CONSTRUCTION
• Structural design office: CTE
• Duration of work: 21 months
• Energy performance: RT 2012 -30% (French thermal regulation standards)
• Labels and certifications: Chantier Vert / HQE Excellent certification / BREEAM Excellent certification / E+C- label, E2C1 level
• Concrete for structure: 11,000 m3
• Reinforcements for reinforced concrete: 800 metric tons
• Floor space: 20,000 m²
• Wall surface area: 6,500 m²
• Beams: 3,500 ml
• Curtain wall facade: 7,000 m²
• Number of production hours: 200,000 hours for all trades, of which 45,000 hours of structural work
• Total number of integration hours: 14,640
• Average number of supervisors and workers: 8 supervisors on average and 20 workers on average during structural work period