Home > Projets > Paint shop – SMART factory

Hambach (57)

PAINT SHOP BUILDING FOR THE SMART FACTORY IN HAMBACH

The operation consists of upgrading work on the AP2 Paint Building for the SMART factory. The operation consists of upgrading work on the AP2 Paint Building for the SMART factory, part of a global project to set up a new vehicle production line for SMART/MERCEDES (since taken over by INEOS).
DEMATHIEU BARD CONSTRUCTION, subcontractor for GEICO, which holds the global Building + Process contract, became involved in the project with a demolition/reconstruction solution for the building under construction.

Project owner: DAIMLER / SMART France
General contractor: GEICO
Project manager: KARDHAM
Design office - structure: CTE & SEDIME
Subcontractor: DEMATHIEU BARD CONSTRUCTION
Duration of works: 10 months

CONSTRUCTION SCOPE

The structure is an industrial building housing automated (Process) vehicle-painting lines.
It consists of a process hall and technical premises, together with tertiary / cloakroom / social spaces.
The infrastructure consists of isolated footings with column support blocks, embankments, industrial paving with strong anti-cracking constraints. Sealed concrete pits for installing the chemical treatment vats for bodywork.
The superstructure is heavy industrial type with concrete posts/beams (executed by our subsidiary CAPREMIB), and precast walls and floor.
The building envelope is comprised of a metal frame roof, a sealing layer, a secondary metal frame facade supporting insulating sandwich panels and aluminum joinery.
We are also responsible for all-trades execution of the social spaces.
Our contract has specific features due to the context and substantial planning challenges to limit the impact of the works for the customer.

KEY WORKSITE FIGURES

Demolition: 4 500 m3
Earthworks: 10 000 m3
Footprint: 12 760 m²
Floor area: 29 000 m²
Tertiary premises as general contractor: 3 000 m²
Concrete: 4 100 m3
Steel: 400 metric tons
High-performance grouting mortar: 300 metric tons
Metal frame: 750 metric tons
Precast posts: 17 23-m high units
Precast beams: 650 units
Total number of hours: 36 000
Average workforce – supervisory and workers: 90