Hambach (57)
The operation consists of upgrading work on the AP2 Paint Building for the SMART factory. The operation consists of upgrading work on the AP2 Paint Building for the SMART factory, part of a global project to set up a new vehicle production line for SMART/MERCEDES (since taken over by INEOS).
DEMATHIEU BARD CONSTRUCTION, subcontractor for GEICO, which holds the global Building + Process contract, became involved in the project with a demolition/reconstruction solution for the building under construction.
• Project owner: DAIMLER / SMART France
• General contractor: GEICO
• Project manager: KARDHAM
• Design office - structure: CTE & SEDIME
• Subcontractor: DEMATHIEU BARD CONSTRUCTION
• Duration of works: 10 months
The structure is an industrial building housing automated (Process) vehicle-painting lines.
It consists of a process hall and technical premises, together with tertiary / cloakroom / social spaces.
The infrastructure consists of isolated footings with column support blocks, embankments, industrial paving with strong anti-cracking constraints. Sealed concrete pits for installing the chemical treatment vats for bodywork.
The superstructure is heavy industrial type with concrete posts/beams (executed by our subsidiary CAPREMIB), and precast walls and floor.
The building envelope is comprised of a metal frame roof, a sealing layer, a secondary metal frame facade supporting insulating sandwich panels and aluminum joinery.
We are also responsible for all-trades execution of the social spaces.
Our contract has specific features due to the context and substantial planning challenges to limit the impact of the works for the customer.
• Demolition: 4 500 m3
• Earthworks: 10 000 m3
• Footprint: 12 760 m²
• Floor area: 29 000 m²
• Tertiary premises as general contractor: 3 000 m²
• Concrete: 4 100 m3
• Steel: 400 metric tons
• High-performance grouting mortar: 300 metric tons
• Metal frame: 750 metric tons
• Precast posts: 17 23-m high units
• Precast beams: 650 units
• Total number of hours: 36 000
• Average workforce – supervisory and workers: 90
Revivez les temps forts et suivez l’évolution du chantier en images
Les collaborateurs qui ont participé et mené à bien cette mission
17, rue Venizelos
57950 Montigny-les-Metz
(+33) 03 87 66 73 11