Lyon (69)

CONSTRUCTION AS GENERAL CONTRACTOR OF 333 HOUSING UNITS

Construction as general contractor of 333 housing units (130-room student residence, 102 private homes, 39 first-time-buyer homes, 62 social housing homes, 253 underground parking spaces).

Project owner: DEMATHIEU BARD IMMOBILIER / COFFIM
Architect: MP&A
• Design office - structure: ICS
Design office – fluids / building economist: TPF
Duration of works: 24 months

CONSTRUCTION SCOPE

• General contractor, all trades
• Demolition of existing buildings
• Removal and evacuation of materials containing asbestos
• Selective deconstruction, sorting and evacuation of materials

SPECIFIC TECHNICAL FEATURES

• Special foundations, lowering of groundwater
• Facade system in Thermédia® concrete
• Base in decorative concrete
• Exterior joinery and roller shutters in PVC

LABELS AND CERTIFICATIONS

• H&E 2012 Profile A
• Qualitel RT2012-10%
• Grand Lyon 2013 guidelines – performance level